Saturday, April 12, 2008

A Close Call

Spring has finally come! Here is the ornamental plum tree in our front yard. It always blooms at the beginning of April and was a little late this year, when we were about to despair that winter was going to hang on forever.













One of the ironies of the arrival of spring after a too-long winter is that I am finishing up several items that we won't use until the weather turns cold again.

There is nothing like knitting to get your heartrate up, when it looks like you might not make a deadline or, even worse, you might run out of yarn. Yesterday I was about to start the edging of the Hemlock Ring Throw and realized that there wouldn't be enough yarn to complete the edging, so the last repeat of the Feather and Fan section was frogged before starting the edging. Half-way around, the remaining ball of yarn started looking very small. Too small. Miniscule. The remaining circumference was looking very, very large. What to do??? Knit faster! It was hard to take the suspense, and I could feel myself breathing harder, my pulse rate up, and the tension was still mounting as I started the last of the eight sections. What would happen if I missed by a yard? A foot? Would I ever find another skein of yarn in the same dye lot? Finally it was over...

The photo shows how much yarn was left at the end, barely enough to thread through a tapestry needle to weave in, maybe 2 inches. And that was after cheating a bit on a few of the loops in the last section. Whew! The edging takes a lot more yarn than one would think! It is now blocking and I think we will get a lot of use out of it next winter. I may even consider making another one as a gift.
Pattern: Hemlock Ring Blanket by Jared Flood, a.k.a. Brooklyntweed
Yarn: Cascade Ecological Wool, 2 skeins (956 yards less 2 inches) Color #8063
Needles: Denise #10
Size: approx. 48" diameter (blocked)

No comments: